Civil & Infrastructure Projects

Sitzler have a proven and award winning capability to undertake a wide range of Civil and Infrastructure projects. Highly experienced in these sectors, we are capable of delivering projects in all locations from remote Australia to Capital Cities across Australia. Sitzler’s civil capabilities cover any project requirement including roadworks, bulk earthworks, subdivision and bridge construction to electrical, mechanical and hydraulic infrastructure works. With a modern, well maintained fleet of plant and equipment combined with Engineers, operators, site and project managers, Sitzler can undertake complex civil projects, producing quality outcomes while at all times offering exceptional value for money.

Click below to view our projects for each sector:

Projects - $100M+

Northern Territory Secure Facilities
Northern Territory Secure Facilities
Holtze, NT
Client: NT Government through PPP Delivery – seNTitel

_

_

The NT Secure Facilities is a 1000 bed Correctional Centre, a 30 Bed multi-classification Mental Health and Behavioral Management Centre and a supported Accommodation and Programs Centre of 50 beds designed to house lower risk offenders whilst providing education and rehabilitation support services.

Darwin Convention and Exhibition Centre
Darwin, NT
Client: Darwin Cove Consortium

_

_

The Darwin Convention Centre a world-class, multi-purpose facility features highly flexible and adaptive spaces to cater for meetings, banquets, conventions and exhibitions. Main areas of the Centre included Plenary Hall with seating 1500 people theater style; Exhibition Hall with a 4000m2 area with the capacity 235 exhibition booths; Function Rooms catering for 400 people banquet style; and flexible meeting rooms.

previous arrowprevious arrow
next arrownext arrow

Projects - $40M-$100M

Roper and Wilton High Level Bridge Crossing
East Arnhem Land, NT
Client: NT Government Department of Infrastructure Planning and Logistics

_

_

The Roper and Wilton Bridge consisted of two new high-level bridge crossings across crocodile infested waterways and 7.5km of approach roads stretching over a 30km long project corridor. Over 150,000m3 of material was sourced from 6 extraction sites to complete the works, The completion of the bridges significantly reduces the average annual duration of road closures to Ngukurr from 180 days down to 12 days leading to significant improvements for services provisions in the area.

Northern Territory Secure Facilities Civil Works
NT Secure Facilities - Civil Works
HOLTZE, NT
Client: NT GOVERNMENT THROUGH PPP DELIVERY - SENTITEL

_

_

The civil works associated with the NT Secure Facilities included the clearing of over 40ha of dense vegetation, mulching, cut and fill operations to form the building platforms and the construction of a reticulated temporary sealed roadway system for construction traffic. All civil works for roads and service installations including power, water, communications, sewer and storm water as well as associated water retention structures were also completed.

previous arrowprevious arrow
next arrownext arrow

Projects - $0M-$40M

Palmerston Police Station
Palmerston Police Station
Palmerston, NT
Client: NT Government Department of Infrastructure, Planning & Logistics

_

_

This new state of the art facility includes administration offices, operational areas, Watch House, Community Hall, services building, and covered parking areas. The new Police Station and Watch House will enable up to 200 Police to deliver key policing outcomes and provide a permanent and central physical presence in the Palmerston area.

Wadeye Police Complex,
Wadeye, NT

_

_

The Wadeye Police complex included the consolidation of 6 existing lots into 1 re zoned super lot. In parallel to construction, this scope included new PWC sewer infrastructure works and the demolition of a block duplex, existing police station, existing PWC tank yard and 2 houses and relocation of 1 house, 2 duplex units and 2 existing sheds.

Delamere Air Weapons Training Range – External Civil Works
NT
Client: Lendlease Building

_

_

Sitzler undertook the bulk earthworks and pavement package for the emitter sites at the Delamere Air Weapons Training Range. This required the sourcing and placement 300,000m3 of engineered fill along with 6 sealed intersections that provide access from the Buntine Highway road corridor, all delivered within a very tight time frame.

Rapid Creek Flood Mitigation
Rapid Creek Flood Mitigation
Darwin, NT
NT Government Department of Infrastructure, Planning and Logistics

_

_

The Rapid Creek Flood Mitigation at Darwin International Airport controls the impact of floodwaters on the Rapid Creek floodplain. Earthworks included the excavation of a 95,000 mega litre detention basin, flood retention embankments and extensive culvert installations including two major crossings under the main airport entrance road, Henry Wrigley Drive.

Litchfield Park Road Upgrade and Seal
Litchfield Park Road Upgrade and Seal
Litchfield National Park, NT
CLIENT: NT Government Department of Infrastructure, Planning and Logistics

_

_

The Litchfield Park Road Upgrade involved the formation upgrading and sealing of the Litchfield Park Road loop, including the construction of the Lower Finniss River Bridge. Two separate sections of existing unsealed road were upgraded with the completed works requiring over 40,000m3 of cut-to-fill earthworks within National Park boundaries.

Archer Zone Substation
Archer Zone Substation
Darwin, NT
CLIENT: Power and Water Corporation

_

_

The Archer Zone Substation ultimately saw the new 27MVA transformer providing alternative power supply and capacity to the fast-growing Palmerston region. Although initially comprising a single 27MVA transformer, the site was designed and constructed to accommodate a future configuration of three 27MVA transformers plus an additional 66kV transmission line linking Archer with the Hudson Creek Substation.

Maningrida Subdivision
Maningrida, NT
Client: Territory Alliance

_

_

As part of the Strategic Indigenous Housing and Infrastructure Program (SIHIP) in the Northern Territory, Sitzler undertook the civil works component of a 140-lot subdivision including all headworks at the Maningrida Community on the remote North Coast of Arnhem Land.

SA Water Workshops Upgrade
SA Water Workshops Upgrade
Happy Valley, SA
CLIENT: South Australian Water Corporation

_

_

The SA Water Workshop is a 510m2 storage shed and welding and includes office space and additional workshop close to the two new structures.